]]>At the heart of the University of Malta Valletta Campus is the Aula Magna which, for decades, has been used as one of the main meeting and conference spaces in Valletta. The Hall has just undergone a major refurbishment project where all the plant and equipment has been changed while respecting the historic fabric of the building. The air conditioning and ventilation systems have been integrated through the use of the rooftop packaged units equipped with direct free cooling. These systems decrease energy consumption especially when the ambient conditions are such, that climate control can be accomplished simply by modulating the amount of fresh air delivered to the space. A DMX lighting control system has also been installed, making the Aula Magna very versatile with respect to the functions it can cater for, from exhibitions to product launches to conferences and lectures
]]>This was an international competition which drew a large number of entries from many countries where CIBSE and ASHRAE are represented.
The objective of the competition was to acknowledged the work done by companies to mentor young engineers. C & C were the runners up in the small company category to Kaizenge who also won the overall title.
]]>CSL is a Systems Integrator in Malta specializing in the following:
The new build comprises two separate Data Centres, a Work Area Recovery (WAR) zone, a lecture hall and a meeting room.
The works involved a number of stages, with the first being the upgrading of the power network infrastructure redundancy to 2N. In order to accomplish this, a parallel power network was designed and implemented. This was carried out in close liaison with CSL engineers in order to ensure that there was no disruption to the power of the existing data center and hence interruptions to the services offered to their clients.
Once this was completed the power to the racks as well as the air conditioning units was connected to the two separate power streams for improved redundancy. This set up was implemented for both the existing data centre as well as the two new ones.
The new Data Centres are equipped with
The remaining spaces were equipped as a training centre and WAR facility. The climate control is via VRF technology operating on R410A refrigerant and the premises is also furnished with a forced fresh air installation.
Lighting has been carried out using LED’s throughout, with a combination of 600mm x 600mm panels as well as circular down lighters.
]]>