
Pauline Johnson Elementary received a full remediation to 2/3 of the exterior. Our scope for this project included the rain screen system and stucco for this over 90 year old school. We also replaced the decaying brick base with a tumbled full brick to match the remaining structure. This was accomplished while school was in session for the entire project. Completed Feb 2014.

This renovation was a mix of finishes and a coordination challenge with the mall remaining open. The scope of work here included steel framing, resheathing, rain screen assembly , brick installation , stucco repairs and a new product called Longboard. Currently under renovation February 2014.

This building in Calgary we completed using the Knight Wall System. Stucco repairs for window and door replacement incorporated with a brick veneer being used to reduce exterior finish weight. Completed August 2013.
]]>
Westminister Landing in New Westminister Quay was a large full remediation encompassing numerous phases. This project included Hardie plank and shingle. Access for residents needed to be maintained with their safety paramount. Completed March 2013.

Sundial at the park was a mid-rise remediation rain screen stucco project. Located in beautiful downtown Vancouver. Completed February 2013.

West Pointe in highly desirable West Vancouver was a massive complex with a lot of challenges. Spectacular rounded balconies and details encompass the whole area. A complete remediation with a full rain screen system and acrylic finish. This was a large complex project with completion scheduled and achieved in 1 1/2 years from start to finish. Completed June 2012.

Located in the trendy west end of Vancouver, detail and style was paramount. The Maplewood project combines accent columns of brick veneer with a rain screen stucco base with Hardie for the remainder of the building. The plank and panel with battens sets off nicely with the brick. Completed January 2012.

Chelsea Green was a partial remediation project completed for BC Housing encompassing 9 separate buildings. Our experienced plasters made the old “face sealed” texture match well with the new rain screen stucco. A well done tricky trowel finish blends in to the non-repaired areas. Vinyl siding was also replaced in a targeted repair plan in cooperation with the engineers plans blending the old with the new. Completed December 2011.

An addition to Semiahmoo mall with a curved front EIFS system with a brick base and columns to match the rest of the mall. Flashing installation was also a part of our scope of work on this project. Completed August 2011.