Advertise with Googlier.com Bistar Limited https://bistarng.com/ Leading engineering firm in Port Harcourt, Rivers State, specializing in oil and gas services, Industrial borehole drilling and water treatment, road and building construction, and piling. Delivering high-standard infrastructure across Nigeria. Mon, 25 May 2026 13:15:25 +0000 en-US hourly 1 https://wordpress.org/?v=7.0.7 https://bistarng.com/wp-content/uploads/2026/05/cropped-Artboard-7-scaled-1-32x32.png Bistar Limited https://bistarng.com/ 32 32 Coastal Infrastructure & Jetty Construction https://bistarng.com/coastal-infrastructure-jetty-construction/ https://bistarng.com/coastal-infrastructure-jetty-construction/#respond Fri, 15 May 2026 20:57:56 +0000 https://bistarng.com/?p=4064 Bistar has a proven track record in maritime and coastal engineering, highlighted by the construction of the Naval Jetty at […]

The post Coastal Infrastructure & Jetty Construction appeared first on Bistar Limited.

]]>
Bistar has a proven track record in maritime and coastal engineering, highlighted by the construction of the Naval Jetty at Ugbola and the community jetty at Igo. These projects required specialized piling works and the construction of reinforced concrete walkways and embankments designed to withstand harsh coastal environments and facilitate safe water transport.

The post Coastal Infrastructure & Jetty Construction appeared first on Bistar Limited.

]]>
https://bistarng.com/coastal-infrastructure-jetty-construction/feed/ 0
Regional Solar-Powered Water Schemes https://bistarng.com/regional-solar-powered-water-schemes/ https://bistarng.com/regional-solar-powered-water-schemes/#respond Fri, 15 May 2026 20:56:21 +0000 https://bistarng.com/?p=4062 To combat water scarcity in rural areas, we implemented several solar-powered water schemes across Ondo State, including the Ore and […]

The post Regional Solar-Powered Water Schemes appeared first on Bistar Limited.

]]>
To combat water scarcity in rural areas, we implemented several solar-powered water schemes across Ondo State, including the Ore and Odonla communities. By utilizing renewable energy to power borehole systems, we provided a low-maintenance, sustainable solution that delivers clean water without relying on the national grid, reinforcing our expertise in green engineering.

The post Regional Solar-Powered Water Schemes appeared first on Bistar Limited.

]]>
https://bistarng.com/regional-solar-powered-water-schemes/feed/ 0
Educational Infrastructure Development https://bistarng.com/educational-infrastructure-development/ https://bistarng.com/educational-infrastructure-development/#respond Fri, 15 May 2026 20:53:34 +0000 https://bistarng.com/?p=4060 Bistar Limited contributed to the expansion of educational facilities in Abuja through the construction of a modern 8-classroom block and […]

The post Educational Infrastructure Development appeared first on Bistar Limited.

]]>
Bistar Limited contributed to the expansion of educational facilities in Abuja through the construction of a modern 8-classroom block and residential staff quarters at GSS Jabi. This project showcases our versatility in civil building works, ensuring high-quality structural finishing and adherence to strict government regulatory standards for public infrastructure.

The post Educational Infrastructure Development appeared first on Bistar Limited.

]]>
https://bistarng.com/educational-infrastructure-development/feed/ 0
Integrated Water Scheme & Civil Works (Lodoni Project) https://bistarng.com/integrated-water-scheme-civil-works-lodoni-project/ https://bistarng.com/integrated-water-scheme-civil-works-lodoni-project/#respond Fri, 15 May 2026 20:50:34 +0000 https://bistarng.com/?p=4058 This comprehensive civil and hydraulic engineering project involved the turnkey construction of a massive water storage and treatment facility. The […]

The post Integrated Water Scheme & Civil Works (Lodoni Project) appeared first on Bistar Limited.

]]>
This comprehensive civil and hydraulic engineering project involved the turnkey construction of a massive water storage and treatment facility. The scope included the fabrication and erection of elevated and ground-level tanks, the construction of a dedicated water treatment house, and the development of staff quarters. This project highlights our capacity to deliver combined civil, mechanical, and structural engineering solutions under a single management framework.

The post Integrated Water Scheme & Civil Works (Lodoni Project) appeared first on Bistar Limited.

]]>
https://bistarng.com/integrated-water-scheme-civil-works-lodoni-project/feed/ 0
Industrial Water System Development at BUA Refinery https://bistarng.com/industrial-water-system-development-at-bua-refinery/ https://bistarng.com/industrial-water-system-development-at-bua-refinery/#respond Fri, 15 May 2026 20:49:22 +0000 https://bistarng.com/?p=4056 We provided comprehensive groundwater management and electrical safety services for the BUA Sugar Refinery. Our team handled the technical recovery […]

The post Industrial Water System Development at BUA Refinery appeared first on Bistar Limited.

]]>
We provided comprehensive groundwater management and electrical safety services for the BUA Sugar Refinery. Our team handled the technical recovery of sunken pumps and the general servicing of multiple industrial boreholes to ensure uninterrupted production. Additionally, we designed and installed specialized lightning protection and earthing systems to safeguard the refinery’s high-value infrastructure from electrical surges.

The post Industrial Water System Development at BUA Refinery appeared first on Bistar Limited.

]]>
https://bistarng.com/industrial-water-system-development-at-bua-refinery/feed/ 0
Hydrocarbon Impacted Site Remediation https://bistarng.com/hydrocarbon-impacted-site-remediation/ https://bistarng.com/hydrocarbon-impacted-site-remediation/#respond Fri, 15 May 2026 20:32:56 +0000 https://bistarng.com/?p=4049 Demonstrating our commitment to environmental sustainability, Bistar is currently managing the remediation of hydrocarbon-impacted soil at the Bara Yiema Ape […]

The post Hydrocarbon Impacted Site Remediation appeared first on Bistar Limited.

]]>
Demonstrating our commitment to environmental sustainability, Bistar is currently managing the remediation of hydrocarbon-impacted soil at the Bara Yiema Ape B site in Gokana. This specialized environmental project involves advanced bio-cell construction, soil excavation, and active oil recovery. Our team utilizes industry-leading remediation techniques to restore the ecological balance of oil-impacted lands in the Niger Delta.

The post Hydrocarbon Impacted Site Remediation appeared first on Bistar Limited.

]]>
https://bistarng.com/hydrocarbon-impacted-site-remediation/feed/ 0
Ajaokuta-Kaduna-Kano (AKK) Gas Pipeline Support https://bistarng.com/ajaokuta-kaduna-kano-akk-gas-pipeline-support/ https://bistarng.com/ajaokuta-kaduna-kano-akk-gas-pipeline-support/#respond Fri, 15 May 2026 20:29:33 +0000 https://bistarng.com/?p=4047 As part of the prestigious AKK Gas Pipeline Project (Segment 2), Bistar Limited provided essential borehole drilling services to support […]

The post Ajaokuta-Kaduna-Kano (AKK) Gas Pipeline Support appeared first on Bistar Limited.

]]>
As part of the prestigious AKK Gas Pipeline Project (Segment 2), Bistar Limited provided essential borehole drilling services to support the infrastructure development of this 318.6km national gas artery. Our contribution ensured that necessary water resources were available for the construction and operational phases of the pipeline, demonstrating our ability to integrate seamlessly into large-scale national energy projects.

The post Ajaokuta-Kaduna-Kano (AKK) Gas Pipeline Support appeared first on Bistar Limited.

]]>
https://bistarng.com/ajaokuta-kaduna-kano-akk-gas-pipeline-support/feed/ 0
Deep Borehole Construction for Community Water https://bistarng.com/deep-borehole-construction-for-community-water/ https://bistarng.com/deep-borehole-construction-for-community-water/#respond Fri, 15 May 2026 20:27:00 +0000 https://bistarng.com/?p=4029 Bistar Limited successfully executed the multi-location construction of industrial-grade boreholes across Oguede, Bonny Old Town, Akiama, and Finima. This project […]

The post Deep Borehole Construction for Community Water appeared first on Bistar Limited.

]]>
Bistar Limited successfully executed the multi-location construction of industrial-grade boreholes across Oguede, Bonny Old Town, Akiama, and Finima. This project was critical for providing sustainable water access to these coastal communities. The technical scope involved complex three-stage drilling to depths of 450 meters, including professional packer installation, borehole cementation, and comprehensive chemical analysis to ensure water safety and system longevity.

The post Deep Borehole Construction for Community Water appeared first on Bistar Limited.

]]>
https://bistarng.com/deep-borehole-construction-for-community-water/feed/ 0